文章摘要
巨厚坚硬顶板工作面的底板破坏规律
Analysis of failure law of the working face floor under thick-hard roof
  
DOI:
中文关键词: 巨厚坚硬顶板;注水试验;数值模拟;底板破坏
英文关键词: thick-hard roof; water injection test; numerical simulation; failure of seam floor
基金项目:
作者单位
白峰青1,2,王斌1,刘猛2 1.河北省资源勘测重点实验室,河北 邯郸 056038
2.河北工程大学 资源学院,河北 邯郸 056038 
摘要点击次数: 1915
全文下载次数: 1264
中文摘要:
      针对郭庄矿开采9#煤时受巨厚坚硬顶板和底板奥灰水双重威胁的情况,利用现场钻孔注水试验手段与数值模拟的方法对9#煤底板进行破坏深度探测及破坏规律的研究.现场钻孔注水试验结果表明,工作面煤层底板监测钻孔控制深度内的底板岩层均发生了不同程度的破坏,最大破坏深度介于18.80~21.00 m,9#煤与下伏奥灰层间距不足20 m;数值模拟结果表明,坚硬顶板条件下,强制放顶比充填开采对煤层底板产生的破坏程度大.
英文摘要:
      Based on special case that the 9# coal mining is under double threat of the thick-hard roof and Ordovician limestone water inrush from floor, a survey and research on the 9# coal floor failure law is conducted with on-site water injection test and numerical simulation. On-site water injection test indicates that different degrees of damage occurred within the scope of monitoring of working face coal seam floor and the max failure depth is up to 18.80~21.00 m; and the distance between 9# coal and Ordovician limestone aquifer is less than 20 m; Simulation results show that,as for the degree of damage of coal seam floor under thick-hard roof,forced carving is more destructive than filling mining.
查看全文   查看/发表评论  下载PDF阅读器